Power System Blockset | ![]() ![]() |
Model a hydraulic turbine and a PID governor system.
Library
Description
The Hydraulic Turbine and Governor block implements a nonlinear hydraulic turbine model, a PID governor system, and a servo-motor [1].
The hydraulic turbine is modeled by the following nonlinear system.
The gate servo-motor is modeled by a second-order system.
Dialog Box and Parameters
Inputs and Outputs
The first two inputs are the desired speed and mechanical power. The third and fourth inputs are the machine's actual speed and electrical power. The fifth input is the speed deviation. Inputs 2 and 4 can be left unconnected if one wishes to use the gate position as input of the feedback loop instead of the power deviation. All inputs are in p.u. The outputs of the block are mechanical power Pm for the Synchronous Machine block and gate opening (both in p.u.).
Example
This demonstration illustrates the use of the Synchronous Machine associated with the Hydraulic Turbine and Governor (HTG) and Excitation System blocks. It also demonstrates the use of the Load Flow to initialize machine currents. A three-phase generator rated 200 MVA, 13.8 kV, 112.5 rpm is connected to a 230 kV network through a Delta-Wye 210 MVA transformer. The network short-circuit level is 10000 VA and the transformer has a 0.16 p.u. leakage reactance. The system starts in steady-state with the generator supplying 150 MW of active power. At t=0.1 s, a three-phase to ground fault occurs on the 230 kV bus of the transformer. The fault is cleared after six cycles (t=0.2 s). Open the Simulink diagram by typing psbturbine
.
In order to start the simulation in steady-state, you must initialize the Synchronous Machine block for the desired load flow. Open the powergui and select Load flow and machine initialization from the Tools menu. The machine Bus Type should be already initialized as "PV generator", indicating that the load flow will be performed with the machine controlling the active power and its terminal voltage. Specify the desired values by entering the following parameters:
Then press the Do Load Flow button. Once the load flow has been solved, the phasors of AB and BC machine voltages as well as the currents flowing out of phases A and B are updated. The machine reactive power, mechanical power, and field voltage requested to supply the electrical power should also be displayed:
In order to start the simulation in steady state with the HTG and Excitation System connected, these two Simulink blocks must also be initialized according to the values calculated by the load flow. Open the HTG block menu and notice that the initial mechanical power has been set to 0.5007 p.u. (100.14 MW). Then, open the Excitation System block menu and note that the initial terminal voltage and field voltage have been set respectively to 1.0 and 1.126 pu. Open the 4 scopes and start the simulation. The simulation starts in steady state.
Observe that the terminal voltage Va is 1.0 p.u. at the beginning of the simulation. It falls to about 0.4 p.u. during the fault and returns to nominal quickly after the fault is cleared. This quick response in terminal voltage is due to the fact that the Excitation System output Vf can go as high as 11.5 p.u. which it does during the fault. The speed of the machine increases to 1.01 p.u. p.u. during the fault then it oscillates around 1 p.u. as the governor system regulates it. The speed takes much longer than the terminal voltage to stabilize mainly because the rate of valve opening/closing in the governor system is limited to 0.1 p.u./s.
References
[1] IEEE Working Group on Prime Mover and Energy Supply Models for System Dynamic Performance Studies, "Hydraulic Turbine and Turbine Control Models for Dynamic Studies", IEEE Transactions on Power Systems, vol. 7, no. 1, February 1992, pp. 167-179.
See Also
Excitation System, Powergui, Synchronous Machine, Steam Turbine and Governor
![]() | GTO | Ideal Switch | ![]() |